MoonRunners
LogoLogo

1028

  1. /
  2. Osmosis
  3. /
  4. Mainnet
  5. /
  6. Governance
  7. /
  8. 1028
  • Docs
  • Support
2026 © Made with 💜 by MoonRunnersAPI OK
DocsSupportDonate

Proposal #1028

Raise Governance Expedited Threshold to 80%

PassedUpdate Params

Passed on 25 Jul 2026 with 89.0% of the votes for yes.

Yes

89.0%

100.0% without abstain

Veto

0.0%

of votes cast

Ended

25 Jul 2026

The ballotvotes cast · final tally
Yes

88.97%

of votes cast

Abstain

10.99%

of votes cast

No

0.04%

of votes cast

Veto

0.00%

of votes cast

This proposal raises the threshold required for an Expedited proposal to pass from 67% to 80% of votes cast.

Details

Osmosis governance recently passed [Hidden link], an Expedited proposal, over a weekend with a turnout of approximately 27% of staked OSMO. This prompted a review of the Expedited path, which confirmed that an Expedited proposal is subject to the standard 30% quorum and a higher 67% approval threshold of votes cast, rather than requiring a higher turnout. This proposal raises the Expedited threshold to better protect the chain on the accelerated path during low-engagement periods without impeding legitimate governance.

Expedited Threshold: 67% to 80% The Expedited threshold was originally set at 67% to reflect hard-fork consensus levels. However, because Expedited proposals only require the standard quorum, at a typical turnout this threshold can be satisfied by a relatively small share of total stake. Even at the highest turnout observed in the last six months (65%), a 67% threshold represents a decision made by approximately 43.5% of staked OSMO. Raising the Expedited threshold to 80% increases this to approximately 52% of stake at the same turnout, providing a meaningful additional safeguard on the accelerated path. Historically, Expedited proposals have passed with approval well above 90%, so this change is not expected to impede legitimate Expedited proposals.

This change affects only the accelerated Expedited path. The quorum (30%), standard proposal threshold (50%), veto threshold (33.4%), voting periods, and deposit requirements are unchanged.

The tradeoff to this is that a minority of stake (20%) can block an expedited proposal from executing. In the event of a malicious block, the fallback would be a manual chain upgrade that uses the baked-in 67% consensus threshold to effect the change.

Forum Post: [Hidden link]

Timeline

  1. Submitted20 Jul 2026
  2. Voting started20 Jul 2026
  3. Voting ended25 Jul 2026
  4. Deposit deadline03 Aug 2026

Proposer

Address
osmo19w2…3hfq0r
Deposit6.0K

Rules

Not recorded for this proposal.