MoonRunners
LogoLogo

77

  1. /
  2. Nolus
  3. /
  4. Mainnet
  5. /
  6. Governance
  7. /
  8. 77
  • Docs
  • Support
2026 © Made with 💜 by MoonRunnersAPI OK
DocsSupportDonate

Proposal #77

Pirin v0.5.2

PassedSoftware Upgrade

Passed on 19 Feb 2024 with 100.0% of the votes for yes.

Yes

100.0%

100.0% without abstain

Veto

0.0%

of votes cast

Ended

19 Feb 2024

The ballotvotes cast · final tally
Yes

100.00%

of votes cast

Abstain

0.00%

of votes cast

No

0.00%

of votes cast

Veto

0.00%

of votes cast

Summary

This on-chain upgrade governance proposal is to adopt v0.5.2 for the Nolus Pirin mainnet which is currently running on v0.5.1. By voting YES to this proposal, you approve of adding these updates to the base layer protocol. This upgrade introduces:

  • An increase of the max size of a wasm contract from 3MB to 5MB to accomodate future newly added supported currencies for leasing.

Changes

A complete changelog can be seen in the v0.5.2 release on [Hidden link].

On-Chain Upgrade Process

When the network reaches the halt height, the state machine program of Nolus will be halted. The classic method for upgrading requires all validators and node operators to manually substitute the existing state machine binary with the new binary. Validators can coordinate with each other on Discord in advance of the release. Please use the "chat" channel under the "Validators" section. The target block for the scheduled update is 4059500 which should happen on the 19th of February, 2024 (Monday) at around 11:30 UTC. As a disclaimer, this is a rough estimate assuming an average block time of 5.75 seconds.

Timeline

  1. Submitted16 Feb 2024
  2. Voting started16 Feb 2024
  3. Voting ended19 Feb 2024
  4. Deposit deadline26 Feb 2024

Proposer

Address
nolus17r…e3u8xv
Deposit2.5K

Rules

Not recorded for this proposal.